Phase I included a new two-story building, load bearing tilt-up concrete panels, steel floor and roof systems. Exterior finishes are painted concrete pre-finished curtain wall and window systems and EPDM roof system.
Phase II included a new two-story building, load bearing wet cast concrete plank floor system and steel roof system. Exterior finishes are painted concrete, pre-finished curtain wall, and window systems with an EPDM roof system. Phase I and Phase II are connected on both levels are are fully sprinklered and fully accessible via an elevator and stair towers.