This overall project consisted of the design and construction of a new 22,424 square foot total building addition, which includes a 7,500 square foot gymnasium for basketball and volleyball, 5,300-SF social hall with an adjacent commercial grade kitchen.
Adjacent to the gymnasium is a third space cafe that is designed to serve coffee and sandwiches to the general public and is accessible from Main Street. All levels are accessible with a large three stop elevator, and an ADA connector promenade. The rear entrance has a dedicated covered vehicle drop-off zone.