Plant 4 – Office & Welfare Facility Addition & Renovation
The scope included the demolition and infill of existing dock doors to accommodate a new two-story addition to the northwest side of the existing Office & Welfare Facility of Plant 4. The new addition was 13,800 SF. The space was designed to accommodate offices, conference area, cafeteria and toilet/locker rooms. The existing maintenance area was expanded west, doubling its current size. The entire office area was reconfigured.
Plant 6 – Office Facility Addition
The 5,650 SF office building addition, to the south wall of the Plant 6 office, was designed to infill the opening between Plant 5 and 6. The addition was designed to allow easy access from Plant 5 to Plant 6 with a central corridor. Floor levels vary by 22”. A ramp was required by the design layout. The addition accommodates offices, a conference area, cafeteria and toilet rooms. An entrance was designed into the office addition with a vestibule on the west side open to the existing parking area.
Plant 5 – Building Expansion
Plant 5 building expansion consisted of a 56,468 SF of expansion to the east end of the existing building. The roof elevation of the existing building end bay was raised to create a high bay roof structure to accommodate new manufacturing equipment. The building expansion construction is designed to match the existing structure and will infill the open space between Plant 4 and 5. The design provided a new fire wall between the expansion and existing storage area of Plant 4.
Plant 5 – Existing Office Renovation
Renovation of existing offices located on the southwest side of existing Plant 5. The renovation consisted of interior finishes, walls, and flooring creating a new office and truck drivers room.
Mechanical Room & Parts Storage
Provide approximately 3,500 SF of new Mechanical Room construction and renovation to 5,200 SF of Maintenance & Parts Storage along north wall of existing Plant 5. New construction was coordinated to extend to the existing column line and vertically to the underside of existing roof deck in Plant 5. Construction was painted CMU wall to 12’ a.f.f. and metal panel to extend to the underside of roof deck. A new 12’ x 12’ overhead door was installed in the north wall of Plant 5 to the exterior located on the west side of the new Mechanical Room.
Plant 5 – Truck Canopy Addition
The scope included a 7,150 SF pre-engineered canopy structure for nine (9) truck bays on the southwest side of existing Plant 5. A 400’ retaining wall was designed for the truck apron along trailer parking, south of Plant 5.