This project consists of creating a new infill metal and glass structure between the existing Church and School buildings. New ramps will allow for accessibility to both the Church and School buildings from the main parking lot. The atrium will be heated with a radiant floor system and cooled with two roof top units. A combination of ceiling-mounted light fixtures and pendant light fixtures will illuminate the atrium space, with the existing stained glass windows receiving new spot light fixtures to simulate natural daylight.
Renovations included: